• Home

Part of Red River Street to close for tree limb pick up

Posted: Updated:

Red River Street Closed to Thru Traffic from Laurent Street to Ben Jordan Street

(VICTORIA, TEXAS) Between the hours of 10 am and 2 pm, the City will close Red River Street to through traffic between Laurent Street and Ben Jordan Street for limb pick-up on Thursday, September 14, 2017. Once the limbs are picked up, the street will re-open to one-way eastbound traffic.  Side streets on the north side of Red River will remain closed. Temporary driveways will be installed for residents or businesses with access only to Red River Street.

Drivers can expect delays in the work zone and should use alternate routes to get around the work zone if possible. All businesses, residents and parking lots in the construction zone will remain accessible via alternate routes.

This construction is part of the $1,716,354.50 Red River Street Utility Replacement and Rehab/Overlay Project (Laurent St. to Ben Jordan St.).  The contractor is Brannan Paving Co., LTD of Victoria, Texas. 

For more information, contact the Public Works/Engineering Department at 485-3340.

Current Conditions
/